implementing decrees Legislative Decree 192/05 - Finally the first!

The last Council of Ministers has finally unearthed the first of the decrees of the Legislative Decree Law 192/05, beginning to "plug" a huge regulatory hole that was created by the enactment of 192. From
draft decree in my possession reports the news in brief:
1) is introduced, "Periodic Heat transfer that identifies the ability of a structure of staggered attenuale and the thermal flow through it during the day;
2) definitavamente is approved the use of UNI TS 11300-1/2;
3) For new construction falls the obligation to verify that the transmittances TEMIC building structures do not differ by more than 30% of the thresholds and the overall yield installation; remains the obligation of verifying the demand for primary energy for space heating EPCI;
4) For new development imposes the requirement of verification of requirements primary energy for summer cooling of the building "Epe, INVOL. This index should not exceed those specified in the decree;
5) is prohibited in buildings with more than 4 units and for those with greater power to 100 kW, the transition from centralized system to an autonomous system;
6) In the case of renovation of buildings with more than 4 units is the introduction of compulsory metering and temperature control for all your unit housing (unless blocked);
7) In the case of new construction or renovations where are installed generators fueled by biomass, can not be verified 'EPCI but different transmittance values \u200b\u200bof the structures that make building envelope;
8) is introduced the obligation to treat the water with softeners or chemical treatments for air conditioning systems with hardness greater than 25 ° French (in case of absence of production of domestic hot water) and greater than 15 ° French (in the presence of production acs);
9) For public buildings, new construction or renovation, the limits are more stringent transmittance of 10% and the yield limit of the system should be calculated with another formula;
10) Duty to central plant heating and summer (if any) for government buildings;
11) In localities with higher irradiance to 290 W / m, the vertical structures must have mass surface excess of 230 kg / m or even to have regular transmittance value less than 0.12 W / mK;
12) In place of the above, structures, horizontal / inclined mat must have a value of less than 0 tramittanza periodic thermal , 20 W / mK;
13) As an alternative to previous assessments, can be used innovative techniques such as green roofs;
14) Obligation (except buildings E.6 and E.8) using external screening systems (except technical impedimentnti or economic). Becomes mandatory in the presence of glass with solar factor of less than or equal to 0.5;
15) In the event of restructuring is required to use film or other systems flitranti / shielding to reduce the amount of heat by radiation, becomes aobbligatorio in presence of glass with solar factor of less than or equal to 0.5;
16) Mandatory use of renewable energy can cover 50% ( 20 in the historic centers) with production needs of acs;
17) A requirement to install photovoltaic systems in new buildings (milleproroghe but the decree has postponed the requirement for municipalities to update their building codes to 01/01/2010).